0 ratings
Rollerblade Lightning Men's Urban Inline Skate, Black and Lime
Rollerblade Lightning Men's Urban Inline Skate, Black and Lime
Rollerblade Lightning Men's Urban Inline Skate, Black and Lime
Rollerblade Lightning Men's Urban Inline Skate, Black and Lime
Rollerblade Lightning Men's Urban Inline Skate, Black and Lime
Rollerblade Lightning Men's Urban Inline Skate, Black and Lime
Rollerblade Lightning Men's Urban Inline Skate, Black and Lime
Inline skating complements an active lifestyle - improves coordination, agility, dynamic balance, strengthens core muscles, burns calories, is a low-impact exercise, and increases self-confidence.
Rollerblade Lightning Men's Urban Inline Skate, Black and Lime
Item #: 253855443

Rollerblade Lightning Men's Urban Inline Skate, Black and Lime

Item #: 253855443

IQD 469758

Price Details

Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )

*All items will import from UK

0 ratings Write a review
In stock
uk Imported from UK store

QTY:

Only 1 item left in stock.
Order now and get it around Monday, October 12
Our Top Logistics Partners
  • fedex
  • dhl
Inline skating complements an active lifestyle - improves coordination, agility, dynamic balance, strengthens core muscles, burns calories, is a low-impact exercise, and increases self-confidence.
Show More
Show More
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment

Product Details

Shop Rollerblade Lightning Men's Urban Inline Skate, Black and Lime online at a best price in Iraq. B0CSPJXWXP
Brand NameRollerblade
UPC888341987088
Number of Items1
Unit Count1.0 count
Included ComponentsPair of Skates, Footboard Sizer insoles, Manual, Allen key, Extra axle to use if removing the brake assembly
Item Type NameRB SKATES
ManufacturerRollerblade
Model Number073726001A1
Manufacturer Part Number073726001A1
Size6
Wheel Size80 Millimetres
Special SizeAdjustable
Wheel MaterialPolyurethane
Sole MaterialPolyurethane
Material TypePlastic
Wheel TypeInline Skate Wheel
Closure TypeBuckle
ColourBlack/White
PatternSolid
BrandRollerblade
MaterialPlastic
Item Weight4.5 lbs (2.04 kg)

Product Description

Have any Query? Chat with us

Customer Questions & Answers

  • Question: How to Shop Rollerblade Lightning Men's Urban Inline Skate, Online From Ubuy?

    Answer: It’s easy to shop Rollerblade Lightning Men's Urban Inline Skate, online from Ubuy. You just have to search for the product, choose your shipping method while checking out and get it delivered to your location.
  • Question: Is Rollerblade Lightning Men's Urban Inline Skate, Available to Shop Online in Iraq?

    Answer: Yes, at Ubuy Iraq this product is available for you to shop at a reasonable price. The Rollerblade Lightning Men's Urban Inline Skate, is not available locally but you can trust us with our express shipping services.
  • Question: How Long Does It Take to Get Product After Placing the Order?

    Answer: The delivery time of your ordered product varies as per what you've ordered and the shipping method that you've chosen. The estimated delivery time is mentioned during the checkout process, so be carefree while shopping.

Rollerblade Racing Skates 073726001A1 Editorial Review

No editorial reviews found

Customer Reviews & Ratings

4.6
195 customers ratings
  • 5 Star
    81%
  • 4 Star
    10%
  • 3 Star
    2%
  • 2 Star
    2%
  • 1 Star
    5%

Review this product

Share your thoughts with other customers

Product Price History

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.